NR12.SEG.BR
Global Engineering Desk
Full Legal Compliance for International Manufacturers

Exporting Machinery to Brazil? Secure Your NR-12 Compliance

We bridge the gap between global safety standards (CE/ISO, OSHA) and Brazilian regulatory requirements. Avoid customs delays, legal liabilities, and operational blocks with Grupo VIKON's turn-key engineering solutions.

100% Brazilian Regulatory Standard
ART / CRT Officially Issued by Local Engineers
Global Desk Direct English Support

Connect with Our Global Engineers

Send us your details for an instant direct connection with our engineering desk.

Legal Security for Foreign Equipment

Why Brazilian NR-12 Documentation is Essential

International safety certifications (like CE marks or OSHA) do not automatically grant legal clearance in Brazil. Under Brazilian labor and civil laws, operating machinery without local compliance documentation can lead to heavy fines, customs impoundment, and civil liabilities for manufacturers and importers.

Technical Dossier & Risk Assessment

We restructure risk assessments (ISO 12100 aligned with NR-12 standards) and translate/adapt engineering manuals into Portuguese to meet mandatory legal specifications.

Electrical & Safety Diagrams

Verification of control circuits, emergency stop categories, and safety relays to match Brazilian electrical standards, backed by officially registered engineering notes (ART/CRT).

Local Engineering Backing

Having Grupo VIKON as your local engineering partner protects your brand reputation, ensuring your clients in Brazil run your machines with absolute peace of mind.

End-to-End Scope

Our Compliance Services for Exporters

01

Gap Analysis & Review

Detailed evaluation of foreign machine blueprints against Brazilian NR-12 criteria before shipment.

02

Risk Assessment (APR)

Hazard identification and risk estimation formulated strictly under ABNT and NR standards.

03

Engineering Adjustments

Specifications for physical guards, electrical interlocks, and safety components required on-site.

04

Official Compliance Report

Final validation report signed by certified Brazilian engineers with valid ART/CRT registration.

Our Framework

The VIKON Methodology for Global Assets

A streamlined three-step workflow designed to save time and eliminate friction for international trade teams.

01

Document Audit

Remote review of technical manuals, electric schematics, and structural designs provided by the manufacturer.

02

Local Adaptation Plan

Mapping necessary physical or electrical retrofits required either at origin or upon arrival at the Brazilian facility.

03

Certification & Handover

Issuance of final compliance certificates and professional engineering backing for seamless plant commissioning.